|
Event / Incident Location
|
| |
6050 W PICO BLVD
|
|
Time of Incident Update
|
| |
06:15 pm
|
|
Activity update
|
| |
WE FOUND THAT THIS 36″ STEEL MAIN WAS SLIPLINED WITH HDPE. THE LEAK IS AT A FUSE JOINT WHERE AN 8″ HDPE MAIN IS CONNECTED TO THE 30″ HDPE TRUNKLINE.
|
|
Incident Commander
|
| |
JOSE LUCERO
|
|
Cell phone number
|
| |
(213) 840-1224
|
|
Additional Notes
|
| |
WE WILL WORK ON SIDELINING AFFECTED SERVICES AND MINIMIZING LEAKAGE SO WE CAN PLATE THE EXCAVATION AND MAKE IT SAFE UNTIL A CONTRACTOR IS ACQUIRED TO MAKE REPAIRS.
|
|
This report submitted by
|
| |
JOSE LUCERO
|
|
Responsible Manager
|
| |
JUSTIN RYAN
|
|
Manager phone number
|
| |
213-792-5476
|
|