|
Location / Address of Incident
|
| |
259 Rosemont Ave.
|
|
Trouble Order Number
|
| |
126006145
|
|
Business Group
|
| |
Central District
|
|
Date of Incident
|
| |
08/13/2026
|
|
Time of incident:
|
| |
12:45 am
|
|
Are media on-site?
|
| |
Yes
|
|
Was DWP Legal notified?
|
| |
No
|
|
Major cross street:
|
| |
Temple St
|
|
Size of main:
|
| |
6 Inch
|
|
Type of main:
|
| |
Cast iron
|
|
System elevation zone
|
| |
619
|
|
Description of Incident
|
| |
LAPD reported a possible Water Main break at the Intersection of Temple St and Rosemont Ave. A DWP crew confirmed the 6-Inch CI Water Main Leak.
|
|
Action taken:
|
| |
DWP Supervisor was notified. A Crew was called out for emergency repairs.
LAPD recently moved several vehicles that were parked on top of the Leak area. Repairs are in progress.
|
|
Injuries:
|
| |
No injuries observed
|
|
Property damage?
|
| |
None observed at this time
|
|
Describe property damage if any:
|
| |
None observed at this time.
|
|
Describe street damage if any:
|
| |
Street has lifted
|
|
Street closure required?
|
| |
Yes
|
|
Describe street closure and anticipated duration if needed:
|
| |
Rosemont Ave is closed from Temple St to Beverly Blvd
|
|
Estimated date and time of service repair/restoration:
|
| |
8/13/2026 @ 2:30 pm
|
|
Area and number of customers affected:
|
| |
Approximately 32 Services and 1 Fire Hydrant
|
|
Type of customers affected:
|
| |
- Residential single family
- Residential multi-family
|
|
Boil water notice required?
|
| |
No
|
|
Additional notes:
|
| |
None at this time
|
|
Incident Commander (IC)
|
| |
Eliseo Gutierrez
|
|
IC cellphone number:
|
| |
(213) 798-6609
|
|
Responsible Manager:
|
| |
Ruben De LA Cruz
|
|
Manager phone number:
|
| |
(213) 949-6485
|
|
This report submitted by:
|
| |
R. Hamada
|
|
Submitter's contact phone:
|
| |
(213) 367-6821
|